Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 8118

2 step stock transfer tracking setup problem

$
0
0

Experts

 

I am trying to setup the tracking of gain/loss for 2 step plant to plant transfer.

 

I have maintained the following

1. Defined number range Z1 for tracking number in HPM--> Setup 2 Step Stock Transfer

2. IS Oil Company Code Parameter assignment: Checkbox for Tracking checked and assigned number range Z1.

3. HPM-->Define 2 step transfer control: Maintained Receiving and Sending plant tolerances, Price option for gain calculation as G/L calc based on receiving plant, Gain handling as Post gain when GR> in-transit qty.

4.  Assigned 2step transfer indicator as 2 in material master oil specific data for both receiving and sending plants.

 

 

I am doing the 2 step transfer without STO using MB1B with movement types 303 and 305.

 

With alll of the abovce, i am still not getting the Tracking Records created.

 

Am I missing something?


Viewing all articles
Browse latest Browse all 8118

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>